Jun 15, 2024  
2023-2024 College Catalog 
    
2023-2024 College Catalog
Add to Program Planner (opens a new window)

NRG 123 PV Performance Analysis


Minimum Units: 3
Maximum Units: 3
Deals with system performance & commissioning including pre-inspection checkout, startup, troubleshooting, verification, and monitoring. Focus is on a safe and properly installed system with overview of advanced metering tools.
Prerequisite Required: NRG 120 .
Add Consent: Not Required
Drop Consent: Not Required
Grading Basis: Student option grading
Course Typically Offered: Winter
This course fulfills a distribution requirement for: Restricted Transfer



Add to Program Planner (opens a new window)