NRG 123 PV Performance Analysis Minimum Units: 3 Maximum Units: 3 Deals with system performance & commissioning including pre-inspection checkout, startup, troubleshooting, verification, and monitoring. Focus is on a safe and properly installed system with overview of advanced metering tools. Prerequisite Required: NRG 120 . Add Consent: Not Required Drop Consent: Not Required Grading Basis: Student option grading Course Typically Offered: Winter This course fulfills a distribution requirement for: Restricted Transfer